Public Deliverables are listed as they are approved

D1.2 IPR requirements

D1.5 Technical/scientific review meeting 3 documents (coming M42)

D2.1 System modelling of distributed and node intelligence: initial common strategy

D2.2 Probabilistic node intelligence.: proof of concept on simulation level

D2.3 RISC-V custom core with embedded probabilistic accelerator: design strategy (draft available)

D2.4 Probabilistic node intellligence: proof of concept on custom hardware level (coming M42)

D3.1 Data-driven model library for sensor networks

D3.2 Distributed learning framework (draft)

D3.3 Probabilistic communication and computation system (draft; coming Oct 2025)

D3.4 Comparative analysis of results (coming M42)

D4.1 Passive localization and tracking validation in multiple scenarios

D4.2 Large space sensing architecture and specification through LoRa technology (draft)

D4.3 Room-level human activity and vital sign monitoring via WiFi (draft)

D4.4 RIS surface prototype and validation for sensing and communication (coming M42)

D5.1 Map of light and in-situ characterization of PV cells

D5.2 Characterization of TEGS in the lab and across the building

D5.3 Design, implementation, and test of the RF energy harvesters (draft)

D5.4 Power supply of the sensor nodes (coming M42)

D6.1 Behavioural biometrics based authentication software system design

D6.2 Behavioural biometrics based authentication hardware system (draft)

D6.3 Garbled circuits protocol for reconfigurable circuit hardware (draft)

D6.4 Homomorphic encryption for physical-layer probabilistic communication (coming M42)

SUSTAIN D7.1 Functional Requirements From The Market Analysis

D7.2 Results from the appropriation study and market analysis (draft; coming Nov 2025)

D7.3 Application scenarios, business plan, road map: use of the new technology (draft)

D7.4 Localization and tracking accuracy benchmark test and prototype for C0 (draft)

D7.5 Gesture recognition accuracy benchmark test and prototype for C1 (draft)

D7.6 Self-healing and autonomous error detection test and prototype for C2 (coming M42)

D7.7 Ethical training workshop for researchers and staff

D8.2 Detailed plan for dissemination and exploitation of results including communication activities

D8.3 Data Management Plan

D8.4 Dissemination of first year project reports and publications

D8.5 Dissemination of second year project reports and publications

D8.6 Dissemination of third year project reports and publications (draft; coming Oct 2025)

D8.7 Update on Data Management Plan

D8.8 Final update on Data Management Plan (coming M42)

D8.9 First update plan for dissemination and exploitation of results incl. communication activities

D8.10 Second update plan for dissemination and exploitation of results incl. communication activities

D8.11 Third update plan for dissemination and exploitation of results incl. communication activities (draft; coming Oct 2025)

D8.12 Evaluation results of the press appearances and social media repercussion (coming M42)

D8.13 Technology to market transition plan and results on the exploitation (coming M42)

D10.1 Report on Portfolio activities 01

D10.2 Report on Portfolio activities 02

D10.3 Report on Portfolio activities 03 (coming M42)